Aperçu avant impression Fermer

Affichage de 2390 résultats

Description archivistique
Image
Aperçu avant impression Affichage :

2390 résultats avec objets numériques Afficher les résultats avec des objets numériques

Demolition of Middle building

Demolition of the middle building. View of the west end. Second story removed with the exception of the rear and side wall.

Horney, Charles Roy, Mr.

Demolition of Middle building

Demolition of middle building. View of the west end of the building. Second story removed with only back and side wall intact. Heating plant stack in the foreground.

Horney, Charles Roy, Mr.

Demolition of Middle building

Demolition of middle building. View of the west end of the building. Second story removed with only back and side wall intact. Heating plant stack in the foreground.

Horney, Charles Roy, Mr.

Residence building

Residence building. Skeletal roof of middle building can be seen on the right side of the photograph.

Horney, Charles Roy, Mr.

Residence building

Residence building. Skeletal roof of middle building can be seen on the right side of the photograph.

Horney, Charles Roy, Mr.

East side of quad

View of east and south end of the quad and Kerr Hall. East end of Ryerson Hall and the residence are also visible.

Horney, Charles Roy, Mr.

East end view of buildings in Quad

East end view of Ryerson Hall, residence, and Middle building. Kerr Hall Gould St. section visible in the background. Photo taken from Kerr Hall.

Horney, Charles Roy, Mr.

Middle Building

Middle building showing wooden walkway/storage structure that used to attach middle building with third building.

Horney, Charles Roy, Mr.

Middle Building

Middle building showing wooden walkway/storage structure that used to attach middle building with third building.

Horney, Charles Roy, Mr.

Middle Building

North east end of Middle building showing wooden walkway structure.

Horney, Charles Roy, Mr.

Clock - carillion tower building

Metal framework of centre section of Howard Kerr Hall South. Framework for clock-carillion tower is up as well. Photo taken looking north from Gould Street.

Horney, Charles Roy, Mr.

Clock - carillion tower building

Metal framework of centre section of Howard Kerr Hall South. Construction workers and material visible around the base of structure. Part of Unit I is visible in the far right corner. Photo taken looking north east along Gould Street.

Horney, Charles Roy, Mr.

Clock - carillion tower building

Metal framework of centre section of Howard Kerr Hall South. Framework for clock-carillion tower is up as well. Photograph taken looking north east on Gould Street. Part of Unit I is visible in the far right corner.

Horney, Charles Roy, Mr.

Howard Kerr Hall North

Portico out onto Gerrard Street that is the entrance to the Ryerson Theatre. Photo taken from inside the quad looking North West. Construction materials are piled against the wall of the building and construction vehicles are scattered about.

Horney, Charles Roy, Mr.

Clock - carillon tower building

Metal framework of centre section of Howard Kerr Hall South - which would eventually house the Principal's office and the Boardroom. Framework for clock-carillon tower is up as well. Framework obscured in photo by the Ryerson Hall building.

Horney, Charles Roy, Mr.

Construction scene inside quadrangle

Photograph taken from inside quadrangle looking east at the brick work being done on Howard Kerr Hall. Remaining Ryerson Hall building visible on the left side of the photo.

Horney, Charles Roy, Mr.

Construction scene inside quadrangle

Photograph taken from inside quadrangle looking east at the brick work being done on Howard Kerr Hall. Remaining Ryerson Hall building visible on the left side of the photo.

Horney, Charles Roy, Mr.

Ryerson Hall

Front of Ryerson Hall with crane, hoarding and construction work ongoing in front of it. Construction of Unit III of Howard Kerr Hall.

Horney, Charles Roy, Mr.

Howard Kerr Hall West

Looking at metal framework for Howard Kerr Hall Unit III along Gould Street. Stone gates for property still in place.

Horney, Charles Roy, Mr.

South section of Howard Kerr Hall

Photograph taken looking east along Gould Street at Unit III of Howard Kerr Hall. Only the metal framework of the section is completed with some marble work along the base. Unit I is visible in the background which is eventually joined with Unit III by a portico.

Horney, Charles Roy, Mr.

South West corner of Howard Kerr Hall

Photograph taken looking east along Gould Street at Unit III of Howard Kerr Hall. Only the metal framework of the section is completed with some marble work along the base.

Horney, Charles Roy, Mr.

Howard Kerr Hall West

Looking north along Victoria Street at the framework of Howard Kerr Hall. Framework obscured by trees.

Horney, Charles Roy, Mr.

Howard Kerr Hall West

Looking north along Victoria Street at the framework of Howard Kerr Hall. Framework obscured by trees.

Horney, Charles Roy, Mr.

Corner of Victoria and Gould Sts.

Looking towards Victoria Street. Underwood building sits on the corner. Photo shows construction cranes and metal framework for Howard Kerr Hall. Ryerson Hall visible on the right side.

Horney, Charles Roy, Mr.

East corner of Ryerson Hall

East end of Ryerson Hall building. Perini construction sign on the fence in front of the building. Photo taken from Bond Street looking at the front of the structure. Howard Kerr Hall Unit I visible on the right side of the photo.

Horney, Charles Roy, Mr.

Metal framework and construction crane

West end of Ryerson Hall building. Photograph taken from Bond Street looking towards the structure. Metal framework for Howard Kerr Hall visible on the left side of the photograph.

Horney, Charles Roy, Mr.

South West corner of campus

Looking from the corner of Gould and Victoria Sts at the campus and construction. Visible is the metal framework along Victoria St. for Howard Kerr Hall, the heating plant building and the West side of Ryerson Hall.

Horney, Charles Roy, Mr.

Middle building

Middle building with construction materials lying against its walls. Cars parked outside the construction hoarding.

Horney, Charles Roy, Mr.

Middle building

Middle building with construction materials lying against its walls. Metal framework for Howard Kerr Hall along Victoria Street visible on the right side of the photo.

Horney, Charles Roy, Mr.

South West corner construction

South West corner of Ryerson Hall and heating plant building. Iron framework for Unit II of Howard Kerr Hall visible on left side of photo and beginning of foundation along Gould Street visible.

Horney, Charles Roy, Mr.

Ryerson Hall

Ryerson Hall building along Gould St. Egerton Ryerson statue has already been removed for storage and there is hoarding along the front of the building.

Horney, Charles Roy, Mr.

Three original campus buildings

View of three original site buildings. Visible in the North East corner of Ryerson Hall (Normal School building) and the Principal's house.

Horney, Charles Roy, Mr.

Building framework

Erection of steel beam framework for Howard Kerr Hall Unit II at North end of property.

Horney, Charles Roy, Mr.

Building framework

Erection of steel beam framework for Howard Kerr Hall Unit II at North end of property.

Horney, Charles Roy, Mr.

Building framework

Erection of steel beam framework for Howard Kerr Hall Unit II at North end of property.

Horney, Charles Roy, Mr.

Excavation of South end of property

Excavation in front of Ryerson Hall (Normal School). View looking east towards Church St. Already constructed section of Howard Kerr Hall is visible in the background.

Horney, Charles Roy, Mr.

Excavation of west side of property

Excavation of west side of property looking North towards Gerrard Street. Gorrie's Motors and Maple Leaf Gardens visible in the background. Excavation for the construction of Howard Kerr Hall.

Horney, Charles Roy, Mr.

Excavation of north section of property

Excavation of North end of property in preparation for Howard Kerr Hall construction. View looking East towards already constructed section of Howard Kerr Hall.

Horney, Charles Roy, Mr.

Clearing of site for construction

Rubbled filled construction site with bull dozer. South buildings still visible on left side of photograph. Back view of building from RG 536.15.14.05.

Horney, Charles Roy, Mr.

Demolition of old buildings

One of the original buildings demolished down to basement level. See RG 536.15.14.06 for back view of demolition of this building.

Horney, Charles Roy, Mr.

Excavation for Howard Kerr Hall construction

Excavation along West border of property for Howard Kerr Hall construction. East Kerr Hall visible in the background with radio antenna on its' roof. South Normal School buildings visible on the right side of the photograph.

Horney, Charles Roy, Mr.

Ryerson Hall building

Ryerson Hall (Normal School main building) with construction activity beginning in front of it.

Horney, Charles Roy, Mr.

Egerton Ryerson statue under cover

Egerton Ryerson statue and plinth under cover after being moved from in front of Ryerson Hall in anticipation of construction of the final section of Howard Kerr Hall. Statue is located along Gould Street in front of Unit I.

Horney, Charles Roy, Mr.

Résultats 401 à 500 sur 2390