Affichage de 2 résultats

Description archivistique
Shore Tilbe Irwin + Partners Canada Avec objets numériques
Aperçu avant impression Affichage :

CIL House Offices

Head office is jointly occupied by Catholic Education Center. Building cost was 33.5 million including land and construction. View of entrance, interior and exterior of the building. Images 2009.002.016.002 & 003 had yellow sticky notes attached indicating they were considered for the July 1982 cover of Canadian Architect magazine. The sticky notes were kept with the files. Images of the reception area show a ceramic mural by Angelo di Petta called Canadian Allegory. This mural is made of 84 tiles which will cover the entire third floor lobby wall.

Spalding-Smith, Fiona