Print preview Close

Showing 2 results

Archival description
Spalding-Smith, Fiona Toronto Image
Print preview View:

2 results with digital objects Show results with digital objects

Roy Thomson Hall

Home of the Toronto Symphony Orchestra and the Toronto Mendelssohn Choir. Starting date of the construction is 1978, opened in 1982. photographs of the model,different construction stages, completed building, interior and prespective view of Roy Thompson hall.

Spalding-Smith, Fiona

CIL House Offices

Head office is jointly occupied by Catholic Education Center. Building cost was 33.5 million including land and construction. View of entrance, interior and exterior of the building. Images 2009.002.016.002 & 003 had yellow sticky notes attached indicating they were considered for the July 1982 cover of Canadian Architect magazine. The sticky notes were kept with the files. Images of the reception area show a ceramic mural by Angelo di Petta called Canadian Allegory. This mural is made of 84 tiles which will cover the entire third floor lobby wall.

Spalding-Smith, Fiona